We are.....happy birds...now:).....wohooo...everything is ready for the move and we are moving next Thursday..the 25th..
We had our PCI on 11th and nothing major was found on that day and took only about 2.5 hours..Rick promised us a hand over date to 25th of August, exactly two weeks after the PCI but we were not sure about this until today since the bank wanted the Occupany Certificate 5 days before they can release the final payment..SO...we received our Occupancy Certificate today and now it is up to the bank to play the game..:)
I and hubby both are having 25th and 26th off the work and planning to move on the day of handover itself..I cant wait anymore so I pursuaded DH for the move on the handover day itself..otherwise he was starting to say this and that and it is diificult to move on the day of hand over with all the other work......who cares.....!
I called all the places where we had ordered our furniture and aranged them to be delivered/ picked up on 25th and 26th...but still there is lot more to buy when I think about the whole house in one big picture...
We have ordered our roman blinds from one of our friends for a cheaper price for three bedrooms (except for master bedroom where a sheer curtain to go when I get $$$), activity room and theatre room and they will be delivered probably on the day of moving...We bought PVC eco blinds from Freedom for the bathroom, Ensuite and toilet windows and we need to get them cut and fit into the windows by Onsite blinds (thanks Flipflop for recommending them). I ordered temporary blinds from Blinds in a Box for $99 (two boxes) for all the other windows until we get sheer curtains and roller blinds (for sliding doors)...and they will arrive in two days
I should start packing now and have given notice for our rental for 28th...so just three days from handover to empty the whole house..
Sorry couldn't take many photos on the day of PCI...just few photos of the facade...I am in lurve with my front door...:)
Our Newington 35
We are a small family of three my hubby, me and our cute little Thehan. This is our first build with Carlisle and please join with us to share our journey in building Newington 35.
Wednesday, August 17, 2011
Saturday, July 23, 2011
Almost Finished..........!!
It has been a while since I last posted and we have been given a PCI date, on 11th of August..................
Everything is being finished very fast and since my last post we have been painted, tiled (only wet areas), Floor boards installed to the living areas, Carpets installed to the rooms, study, launge and Theatre...Light fittings fixed, rangehood installed, tapware installed (but the wrong basin tapware has been installed and this need to be fixed), Termite protections done, front facede renedring done and brick wash was finished yesterday.....
So it is now not lot more to be finished and as per my understanding, it is only the front stained doors, timber look garage door, balcony railings, glass splashback and stairs that need to be finished/installed/stained. Overall the house looks great and we are so...........ooo Happy..!!:) I couldn't stop taking photos yesterday and we are counting days for the PCI now..! God should bless Carlisle (or our SS Rick) for our peacefull minds in building our house..!!
Everything is being finished very fast and since my last post we have been painted, tiled (only wet areas), Floor boards installed to the living areas, Carpets installed to the rooms, study, launge and Theatre...Light fittings fixed, rangehood installed, tapware installed (but the wrong basin tapware has been installed and this need to be fixed), Termite protections done, front facede renedring done and brick wash was finished yesterday.....
So it is now not lot more to be finished and as per my understanding, it is only the front stained doors, timber look garage door, balcony railings, glass splashback and stairs that need to be finished/installed/stained. Overall the house looks great and we are so...........ooo Happy..!!:) I couldn't stop taking photos yesterday and we are counting days for the PCI now..! God should bless Carlisle (or our SS Rick) for our peacefull minds in building our house..!!
Rendered Front Facade
Brick wash in progress..
Our Carpet...
Theatre room Carpet
Theatre room Carpet 2:)
Kitchen
Kitchen with floor boards
Dining room and alfresco on a side
Front entry hall
Family room
Kitchen with island bench
Kitchen with lovely windows and alfresco on the other side
Sparkling powder room and ugly hub mixer installed instead of basin mixer...this need to be fixed.
Powder room
Carpeted Launge
Front entry doors to be stained
Carpeted Study
Carpeted stairs
View of the upstair activity room from Master Bed
Ensuite
Ensuite
Mirrors on the Walk In Robe cupboard doors
Feature tile on the Ensuite shower
Ensuite Toilet
Colour rendered Balcony and tiles need to be cleaned
Carpeted bed room 2
Bedroom 2 - Cupboard shelves
Bath room shower feature tile
Bathroom with the Bath tub
Upstair seperate toilet
Carpeted Upstair activity room...and love the view from Window..
Bedroom 3
View from Bed room 3 Window
Bed room 4 and View from the Bed room 4 Window
View of the house inside from Upstair activity to Master Bed room
Linnen Cupboard
View on the way back from Upstair to Downstair
View of Study and Launge
Dining and Theatre room
This is how our house looks now..doesn't she look great..:)?